DO TMDL Archive
July 16th Non Point Source Tracking/Monitoring Meeting
Minutes and hand-out from meeting
Ecology BAP review and UW response
Ecology Phase 1 BAP review and memo. UW response.
July 17th Toolbox Advisory Group Meeting
July 17th agenda, minutes and meeting materials.
Draft definitions for static equivalency, alternate season limits, dynamic equivalency, Ortho-P and BAP for tool box development
Draft tool box definitions to be reviewed at July 17th advisory group meeting.
PSU Location Ratios Framework
June 26, 2012 Portland State University (PSU) report “Spokane River Location Ratios” for the 38 mile section between the Washington-Idaho state line and Long…
June 19th DO TMDL Advisory Group Meeting
The DO TMDL Advisory Group Meeting Date: Tuesday, June 19th Time: 2:00 — 4:30 pm Location: Liberty Lake Sewer and Water District (map) Call…
CE-QUAL-W2 input files from the Alternate Spokane River TMDL Scenario
Below are CE-QUAL-W2 input files from the Alternate Spokane River TMDL Scenario, with Alternate Seasonal Limits as described in LimnoTech May 18, 2011 memorandum…
Documentation of Alternate Spokane River TMDL Scenario – with Alternate Seasonal Limits for Inland Empire Paper
Issued May 18, 2011 Memo from LimnoTech. “This memorandum documents a new simulation that amends the previous alternative by including alternate seasonal phosphorus limits…
Evaluation of Alternative Effluent Limits for Consistency with the Spokane River TMDL and Compliance with Washington Water Quality Standards
Issued May 31, 2011 “Ecology and EPA have evaluated modeling performed by LimnoTech on behalf of the Spokane River Stewardship Partners (SRSP) to determine…